Text Box: Steel Gator, Inc.

Service Plans

  Home

  Services

  Products

  Contact Us

  Things To Do

  About Us

  Get Directions

  Downloads

Text Box:

Bi-annual replacement of filters, dusting of shelves, and vacuuming debris from bottom of cabinet. More

  Articles

        Individual Testing

Text Box:         Service Plans

Annual inventory of electrical equipment in traffic signal control cabinet. Inventory includes documentation of make, model, serial number, and firmware for each component in cabinet. Stage II also includes all items of Stage I. More

Annual testing of either MMU or Conflict Monitor. Hard and electronic documentation of test results are provided. Stage III testing also includes all items of Stage I and Stage II. More

This is our most complete service plan. Annual testing of all electronic components in traffic control cabinet. Hard and electronic documentation of test results along with our Traffic Signal Diary software. The Steel Gator service plan also includes all items of Stage I, Stage II, and Stage III. More

Steel Gator, Inc. offers various Service Plans to help you maintain the optimal operations of your traffic signal equipment. In addition to the plans listed below, we can custom design a plan that is suited to the needs of your agency.